October 2nd – 8th
With some time off and a break in the weather, I was able to spend some time on constructing the boat shed.
Firstly I had purchased some 220L plastic drums – 8No – which I intend to fill with water and use as weights to help secure the shed to the ground (as this is only a temporary structure). – I will show how this is to be done later.
I built a temporary platform to give me access to the last 2 trusses. I built the trusses and installed these all in one morning then continued framing out the floor ready for plywood.
The front curve frame was next – framed this up to give me enough space to be able to work around with sufficient room, dismantled the truss template and re-used these materials.
Started adding the strip bracing until I ran out of materials – have ordered some more so will complete the bracing this week.
Jobs to complete the boat shed include;
- Install balance of bracing
- Frame out for plywood floor
- Install plywood flooring
- Frame end wall, with door opening and ventilation (Make doors)
- Install coverings – tarps to go on
- Install “tie downs” with weights