Week ending 05 August 2018
Not much happened over the last week, more plugs (will need to make some more), sanding the superstructure and I made the steam box.
Sanding – was sick of plus so I sanded down the port side of the supper structure, working my way down to the hull, no pictures but very dusty.
Also cleaned up the inside of the hull where ribs removed.
Steam box – made from a 250mm dia PVC drainage pipe and a wall paper streamer, made some stands and inserted some spacers. I did a test run and it held the stream really well. I just need to add a condensation drain in the base.